Balancing of machines for complete
process house :Part-4 Mercerization
For this purpose one Mercerizing machine (chain
type) is required.
Machine working speed: 40 m/min, M/c utilization=
75%
Total production per shift (8 hours or 480 min)=
(speed x utilization x 480)/100
= (40 x 75 x 480)/100 = 14,400 meter
Total fabric to be mercerized= 50,000/-
14,400 meter fabric treated in 8 hours
50,000 meter…………= (8 x 50,000)/14,400 = Approx 28
hrs