Balancing of machines for complete
process house :Part-3
Scouring and Bleaching
For this purpose one Pre-treatment Range (PTR) is
required.
Machine working speed: 60 m/min, M/c utilization=
80%
Total production per shift (8 hours or 480 min)=
(speed x utilization x 480)/100
= (60 x 80 x 480)/100 = 23,040 meter
Total fabric to be pretreated= 50,000/-
23,040 meter fabric treated in 8 hours
50,000 meter…………= (8 x 50,000)/23040 = 17.36 hrs