Balancing of machines for complete process house :Part-3 Scouring and Bleaching

For this purpose one Pre-treatment Range (PTR) is required.

Machine working speed: 60 m/min, M/c utilization= 80%

Total production per shift (8 hours or 480 min)= (speed x utilization x 480)/100
= (60 x 80 x 480)/100 = 23,040 meter

Total fabric to be pretreated= 50,000/-

23,040 meter fabric treated in 8 hours

50,000 meter…………= (8 x 50,000)/23040 = 17.36 hrs