Balancing of machines for complete process house :Part-2 Processing on  Singeing cum desizing machine

This will be used to remove protruding fibre from the surface of fabric by singeing process followed by  desizing of fabric.

Let Machine working speed: 120 m/min, M/c utilization= 75%

Total production per shift (8 hours or 480 min)= (speed x utilization x 480)/100
= (120 x 75 x 480)/100 = 43,200 meter

Total fabric to be singed and desized= 50,000/-

43200 meter processed in 8 hours

For 50,000 meter = (8 x 50,000)/43200 = 9.25 hours