Let Machine working speed: 120 m/min, M/c
utilization= 75%
Total production per shift (8 hours or 480 min)=
(speed x utilization x 480)/100
= (120 x 75 x 480)/100 = 43,200 meter
Total fabric to be singed and desized= 50,000/-
43200 meter processed in 8 hours
For 50,000 meter = (8 x 50,000)/43200 = 9.25 hours