Showing posts with label dyeing. Show all posts
Showing posts with label dyeing. Show all posts

Thursday, 29 March 2018


Balancing of machines for complete process house :Part-5 Dyeing

For this purpose one CDR (Continuous Dyeing Range - Open width) is required

Machine working speed: 40 m/min, M/c utilization= 75%

Total production per shift (8 hours or 480 min)= (speed x utilization x 480)/100
= (40 x 75 x 480)/100 = 14,400 meter

Total fabric to be dyed= 50,000/-

14,400 meter fabric treated in 8 hours

50,000 meter…………= (8 x 50,000)/14,400 = Approx 28 h



Balancing of machines for complete process house :Part-1 (Introduction)
      Machine balancing is a most important part of any process house to run production smoothly.
      Let us take example of dyeing of 50,000 meter 100% cotton medium weigh quality (150 gsm) fabric to understand this

Process flow:

To start it, let us have following process flow:
Grey cotton fabric------Singeing & Desizing------Scouring------Bleaching-------mercerizing-----dyeing-----finishing----finish folding

Let us have following type of machines to carry out processing of 100% cotton fabric:
      Singeing cum Desizing
      Scouring & Bleaching (Pretreatment renage-PTR)
      Mercerizing
      Continuous dyeing range (CDR)
      Softening & Drying on stenter
      Sanforzing (Zero-zero)